Compliance

SPCC compliance, without the guesswork

40 CFR Part 112 applies to far more facilities than think it does - and the determination that it does not apply to you is itself something an inspector will ask to see. Start with the four questions below.

0Gallons aboveground
0Gallons buried
0Year review cycle
0Years of inspection records
Start here

Does the rule apply to you?

Four questions, answered in your browser. Nothing is transmitted or stored.

Does 40 CFR 112 apply to you?

Four questions. No data leaves your browser.

Is your total aboveground oil storage capacity more than 1,320 US gallons, counting only containers of 55 gallons or more?

Is your completely buried storage capacity more than 42,000 gallons, excluding tanks already regulated under 40 CFR 280/281?

Could a discharge from your facility reasonably be expected to reach navigable waters of the United States or adjoining shorelines?

Is your total aboveground capacity 10,000 gallons or less, with no single discharge over 1,000 gallons and no two discharges over 42 gallons in the past three years?

Screening tool based on the applicability tests in 40 CFR 112.1 and 112.3. It is not a legal determination.

What the rule wants

The six things every plan must do

Size the containment

A written capacity calculation for every bulk storage container, with displacement and rainfall accounted for.

Describe the facility

A diagram, tank schedule, fluid types, transfer procedures and the discharge pathways to navigable waters.

Schedule inspections

Written schedules and forms for containers, containment areas and transfer equipment – with records kept three years.

Train the people

Annual discharge prevention briefings and a named person accountable for discharge prevention.

Plan the response

Notification procedures, contact list, staged equipment and a written sequence for the first hour.

Get it certified

A P.E. seal, unless the facility qualifies as Tier I or Tier II and the owner self-certifies.

Tiers

Who can self-certify

Tier I qualifiedTier II qualifiedFull plan
Aboveground capacity10,000 gal or less10,000 gal or lessOver 10,000 gal
Largest container5,000 gal or lessNo single-container limitNo limit
Discharge historyClean, 3 yearsClean, 3 yearsN/A
Plan formatAppendix G templateSelf-certified full planP.E.-certified plan
Who signsOwner or operatorOwner or operatorLicensed P.E.
Environmental equivalence allowed✗✗✓

Tier tests are applied to the facility as a whole. Any deviation from the standard requirements needs P.E. involvement regardless of tier.


Build the plan

Plan development checklist

Work through it in order. Your progress is saved in this browser.

SPCC plan development

0/13
Questions

Frequently asked

Do I count 55-gallon drums?

Yes, containers of 55 gallons and larger count toward the 1,320-gallon aboveground threshold. Anything smaller than 55 gallons is excluded from the count, though it is still oil you are responsible for.

What counts as navigable waters?

Broader than most operators assume. A roadside ditch that drains to a creek has been held to establish the connection. If a release could travel off your property by any surface route, assume the test is met until an engineer tells you otherwise.

How often does the plan need reviewing?

At least every five years, and within six months of any change in facility design, construction, operation or maintenance that materially affects discharge potential. Both reviews are documented in the plan.

What happens if I am inspected without a plan?

Civil penalties under the Clean Water Act, assessed per day of violation. In practice the larger cost is the corrective schedule an inspector imposes and the operational disruption that follows.

Is an SPCC plan the same as a Facility Response Plan?

No. An FRP is a separate, additional requirement for substantial-harm facilities – generally those over one million gallons or with specific proximity to sensitive environments. A facility can need both.

Can the OCA certify my plan?

No. The OCA is not an engineering firm. We publish guidance, run technical review for members and can refer you to P.E.s and member consultants in your region.

From the library

Regulatory updates

Oil Containment Association

Get a second pair of eyes on your plan

OCA members can submit a plan for technical review by the committee. We are not a substitute for your engineer - we are the people who have seen where these plans fail in the field.